Product Description
The German Type Half Coupler is a core load-bearing component for the vertical connection of construction scaffolding steel pipes. It is manufactured in strict compliance with the EN 74 (European Standard) international standard, while meeting the safety and compliance requirements for connectors in the construction industry. Different from ordinary snap-on half couplers, this product adopts an integrated fusion welding process for the lock pin and the coupler body. The weld seams undergo X-ray flaw detection testing, ensuring no incomplete welding or missing welding issues. During construction, it can resist the slippage of the coupler caused by mechanical vibration and heavy load pressure, fundamentally reducing safety hazards at the craftsmanship level.
The main body is made of Q235 high-toughness low-carbon structural steel, featuring corrosion resistance and anti-deformation performance. The optimized lock pin angle and anti-slip handle design enable quick assembly and disassembly without complex tools, thus improving construction efficiency.It is mainly used for the vertical load-bearing connection between vertical poles and horizontal poles, and is particularly suitable for high-strength load-bearing scenarios such as bridge construction, high-rise civil buildings over 20 floors, and large-scale factory construction. It can effectively avoid the risk of project acceptance failure due to "non-compliance with relevant standards" and clearly covers the scaffolding construction needs of mid-to-high-end engineering projects.
Keywords
German Type Half Coupler Welded with Lock Pin Scaffolding Clamp for Construction
Classification
Factory appearance
Packaging and shipping
FAQ
What is the raw material of ringlock scaffolding system ?
S355 Steel.
What is sureface treatment of ringlock scaffolding system ?
Usually Hot Dip galvanized .We also can make painting, powder coated, or E-galvanized ringlock scaffolding. But the anti-rusty function is not as good as the hot dip galvanized ringlock.
What is the diameter of the Vertical / Standard ?
48.3*3.25mm
Do these ringlock components compatible with Layher system.
Yes, Drawings can be send to confirm before mass production.
What is the paymeny term
T/T or LC at Sight
What is the MOQ .
We can accept trial order , we would like to improve together with customers .
What is the lead time ?
4 weeks after order confirmation .