Toplock vertical w spigot
Toplock vertical w spigot
Toplock vertical w spigot
Toplock vertical w spigot
Toplock vertical w spigot
Toplock vertical w spigot
+
  • Toplock vertical w spigot
  • Toplock vertical w spigot
  • Toplock vertical w spigot
  • Toplock vertical w spigot
  • Toplock vertical w spigot
  • Toplock vertical w spigot

The vertical standards (or uprights) are a crucial component of cuplock scaffolding. They form the primary structural framework and provide the vertical support necessary for the entire scaffolding system.

Characteristics of Vertical Standards

1. Material:

- Typically made from high-strength steel(S355B)

to ensure durability and stability.

- Commonly available in different diameters and wall thicknesses to suit various load requirements.

2. Length:

- Standards come in standardized lengths (e.g., 1 meter, 2 meters, 3 meters) to facilitate easy assembly and disassembly.

- Longer sections can be used for taller structures, while shorter sections can be used for smaller or more compact setups.

3. Connections:

- Each standard has cups or sockets at regular intervals (typically every 500 mm or 2 feet) along its length.

- These cups are designed to accept the cuplock connectors, which secure the horizontal ledgers and transoms.

4. Base Connections:

- At the bottom, the standards are connected to base plates or adjustable legs to distribute the load evenly onto the ground and provide stability.

- Adjustable legs allow for leveling on uneven surfaces.

5. Top Connections:

- At the top, standards can be connected to top ledgers or other structural elements to form a complete scaffolding system.

Installation and Maintenance

1. Installation:

- Standards are typically erected vertically and secured to base plates or adjustable legs.

- They are then connected to horizontal ledgers and transoms using cuplock fittings.

2. Maintenance:

- Regular inspections should be conducted to check for any signs of wear, corrosion, or damage.

- Repainting or recoating may be necessary to protect against rust and corrosion.

- Loose or damaged components should be replaced promptly to maintain structural integrity.

Example Usage

- Building Construction: Vertical standards are used to erect the main framework of scaffolding around a building.

- Bridge and Tower Construction: They provide the necessary support for workers to access different parts of the structure.

- Event Staging: Used to create temporary structures that need to support heavy loads and ensure safety.

Code

Description

Weight (Kgs)

534

0.5M Cup Lock Vertical w/spigot-1cup

3.68

535

1.0M Cup Lock Vertical w/spigot-1cup

6.36

536

1.5M Cup Lock Vertical w/spigot-1cup

8.96

537

2.0M Cup Lock Vertical w/spigot-1cup

11.72

538

2.5M Cup Lock Vertical w/spigot-1cup

14.25

539

3.0M Cup Lock Vertical w/spigot-1cup

17.10

Toplock vertical w spigot
Toplock vertical w spigot
Toplock vertical w spigot
Toplock vertical w spigot
Toplock vertical w spigot
Toplock vertical w spigot
+
  • Toplock vertical w spigot
  • Toplock vertical w spigot
  • Toplock vertical w spigot
  • Toplock vertical w spigot
  • Toplock vertical w spigot
  • Toplock vertical w spigot

Toplock vertical w spigot


They form the primary structural framework and provide the vertical support necessary for the entire scaffolding system.

Classification

Factory appearance

Factory appearance
Factory appearance
Factory appearance
Factory appearance
Factory appearance
Factory appearance

Packaging and shipping

Packaging and shipping
Packaging and shipping
Packaging and shipping
Packaging and shipping
Packaging and shipping
Packaging and shipping

FAQ

What is the raw material of ringlock scaffolding system ?

S355 Steel.

What is sureface treatment of ringlock scaffolding system ?

Usually  Hot Dip galvanized   .We also can make painting, powder coated, or E-galvanized ringlock scaffolding. But the anti-rusty function is not as good as the hot dip galvanized ringlock.

What is the diameter of the Vertical / Standard ?

48.3*3.25mm

Do these ringlock components compatible with Layher system.

Yes, Drawings can be send to confirm before mass production. 

What is the paymeny term

T/T or LC at Sight 

What is the MOQ .

We can accept trial order , we would like to improve together with  customers .

What is the lead time ?

4 weeks after  order confirmation .

Get A Quote

Note: Please leave your contact information and our professionals will contact you as soon as possible!

Submit

Are you interested in our product?

* Note: Please be sure to fill in the information accurately and keep the communication open. We will get in touch with you as soon as possible