The vertical standards (or uprights) are a crucial component of cuplock scaffolding. They form the primary structural framework and provide the vertical support necessary for the entire scaffolding system.
Characteristics of Vertical Standards
1. Material:
- Typically made from high-strength steel(S355B)
to ensure durability and stability.
- Commonly available in different diameters and wall thicknesses to suit various load requirements.
2. Length:
- Standards come in standardized lengths (e.g., 1 meter, 2 meters, 3 meters) to facilitate easy assembly and disassembly.
- Longer sections can be used for taller structures, while shorter sections can be used for smaller or more compact setups.
3. Connections:
- Each standard has cups or sockets at regular intervals (typically every 500 mm or 2 feet) along its length.
- These cups are designed to accept the cuplock connectors, which secure the horizontal ledgers and transoms.
4. Base Connections:
- At the bottom, the standards are connected to base plates or adjustable legs to distribute the load evenly onto the ground and provide stability.
- Adjustable legs allow for leveling on uneven surfaces.
5. Top Connections:
- At the top, standards can be connected to top ledgers or other structural elements to form a complete scaffolding system.
Installation and Maintenance
1. Installation:
- Standards are typically erected vertically and secured to base plates or adjustable legs.
- They are then connected to horizontal ledgers and transoms using cuplock fittings.
2. Maintenance:
- Regular inspections should be conducted to check for any signs of wear, corrosion, or damage.
- Repainting or recoating may be necessary to protect against rust and corrosion.
- Loose or damaged components should be replaced promptly to maintain structural integrity.
Example Usage
- Building Construction: Vertical standards are used to erect the main framework of scaffolding around a building.
- Bridge and Tower Construction: They provide the necessary support for workers to access different parts of the structure.
- Event Staging: Used to create temporary structures that need to support heavy loads and ensure safety.
Code | Description | Weight (Kgs) |
534 | 0.5M Cup Lock Vertical w/spigot-1cup | 3.68 |
535 | 1.0M Cup Lock Vertical w/spigot-1cup | 6.36 |
536 | 1.5M Cup Lock Vertical w/spigot-1cup | 8.96 |
537 | 2.0M Cup Lock Vertical w/spigot-1cup | 11.72 |
538 | 2.5M Cup Lock Vertical w/spigot-1cup | 14.25 |
539 | 3.0M Cup Lock Vertical w/spigot-1cup | 17.10 |
Keywords
Toplock vertical w spigot
Classification
Factory appearance
Packaging and shipping
FAQ
What is the raw material of ringlock scaffolding system ?
S355 Steel.
What is sureface treatment of ringlock scaffolding system ?
Usually Hot Dip galvanized .We also can make painting, powder coated, or E-galvanized ringlock scaffolding. But the anti-rusty function is not as good as the hot dip galvanized ringlock.
What is the diameter of the Vertical / Standard ?
48.3*3.25mm
Do these ringlock components compatible with Layher system.
Yes, Drawings can be send to confirm before mass production.
What is the paymeny term
T/T or LC at Sight
What is the MOQ .
We can accept trial order , we would like to improve together with customers .
What is the lead time ?
4 weeks after order confirmation .