







Standard Vertical Pipe:
Raw material steel pipe 48mm diameter x 3mm thick.
The Standards Vertical & Ledger (Horizontal) are two components of cup lock scaffolding system.
The standard vertical cup lock pipe are formed by two cups - fixed bottom cup which is welded to the standard vertical pipe while the movable top cup rotated downwards to tightened the horizontal ledger pipe.
The forged blade welded at the end of horizontal ledger pipe.
Horizontal Ledger Pipe:
High grade steel pipe 48 mm diameter .The forged blade welded at the end of horizontal ledger pipe which locate between the top & bottom cup.
Horizontal Ledger Pipe:
High grade steel pipe 48 mm diameter .The forged blade welded at the end of horizontal ledger pipe which locate between the top & bottom cup.
Keywords








Cuplock Scaffolding
Classification
Component parts
Factory appearance






Packaging and shipping






FAQ
What is the raw material of ringlock scaffolding system ?
S355 Steel.
What is sureface treatment of ringlock scaffolding system ?
Usually Hot Dip galvanized .We also can make painting, powder coated, or E-galvanized ringlock scaffolding. But the anti-rusty function is not as good as the hot dip galvanized ringlock.
What is the diameter of the Vertical / Standard ?
48.3*3.25mm
Do these ringlock components compatible with Layher system.
Yes, Drawings can be send to confirm before mass production.
What is the paymeny term
T/T or LC at Sight
What is the MOQ .
We can accept trial order , we would like to improve together with customers .
What is the lead time ?
4 weeks after order confirmation .