Quality requirements for scaffolding construction
Specialized personnel should inspect the already erected scaffolding, and there should be quantitative content during the inspection.
Sep 13,2024

1. Scaffolding needs to be erected strictly according to the special construction plan, with rigorous technical disclosure, operators need to perform strictly, and * * * error values need to be controlled within the allowable plan.
2. Specialized personnel should inspect the already erected scaffolding, and there should be quantitative content during the inspection.
3. It is necessary to set up the external scaffolding in advance to meet the needs of development and safe production. The external scaffolding must ensure satisfactory stability and robustness.
4. It is necessary to send dedicated personnel to command the dismantling of the external frame. Materials must not be thrown from high altitude and should be passed up and down by workers. The dismantled materials should be classified and stacked neatly to achieve civilized construction treatment.
Related Posts